School and Campus Concrete Construction in Midland, Texas

School construction runs on a calendar that nobody can move. A campus has to open when students arrive, and the concrete that supports it, from footings to bus loops, has to be finished in a window that closes with the first day of classes. Districts, colleges and charter operators plan years ahead, but the summer months are the time when most of the visible site work happens, and a missed pour in May can echo through the whole project.

The buildings come in many types. Elementary and middle schools are usually single story with wide corridors, gymnasiums and cafeterias. High schools add large athletic structures, performing arts spaces and career training shops. College and university buildings bring laboratories, engineering halls and student housing. Each type puts different demands on the slab, from simple broom finishes in classrooms to flat, vibration-resistant floors in labs.

Concrete Contractors of Midland places and finishes foundations, slabs, walks, bus lanes and parking for education owners and coordinates the earthwork and utility trades. We build the plan around the school calendar, not the other way around.

Concrete in classrooms, gyms and campuses

The basic package includes footings, slab on grade, grade beams where soils require them, gym floors, loading dock slabs for kitchens, canopy piers and exterior flatwork. For multi story buildings we add elevated slabs, stair towers and elevator pits. Slab on grade placement in classrooms is planned for flooring that will be installed soon after, so moisture and flatness are checked before the next trade starts.

Exterior work is extensive. Bus loops and drop-off lanes need thick sections to withstand repeated heavy loads, parent pickup lines need long, smooth lanes with good drainage, and sidewalks and flatwork must be accessible and wide enough for students at passing time. Playground pads, outdoor classrooms and stadium plazas are often included as alternates. Career training programs bring their own needs, such as hangar-style shop bays, welding labs with heavy embed plates and vehicle lifts. For aviation programs, the slab and apron details borrow from our aircraft hangar work, with floors sloped for drainage and designed for wheel loads.

Concrete operations and supporting trades

Concrete trade partners place and finish the structural concrete and flatwork, from the first footing to the last sidewalk. We coordinate trade partners for utilities and earthwork. That arrangement is the same for a rural school as for a college building, and it allows us to give districts and construction managers a single sequence for site work.

Schools often follow public procurement rules, with bid forms, bonds and certified payrolls. We handle that paperwork as a routine part of the proposal and keep quantities and unit prices clear so alternates can be priced and compared without confusion. Districts also appreciate a contractor who is realistic about long lead items. If a gym floor needs a special curing period or a stadium pad is dependent on a vendor's embeds, we put the date in the proposal and the calendar and do not leave it to be discovered later.

Campuses we plan for across the region

Education construction is spread across the basin. The Midland College campus area includes technical, aviation and petroleum training sites, and the University of Texas Permian Basin built a three story, 105,801 square foot engineering building on its Midland campus, with completion listed for April 2019. That project shows the scale of higher education work in the area, and it shows how closely campus buildings are tied to the region's industries.

Further out, communities such as Big Spring support their own college and school districts, and we mobilize crews there as needed. Webb Air Force Base was deactivated in 1977 and its site became Big Spring Industrial Park, now the McMahon-Wrinkle Industrial Airpark, which hints at how education and training programs sometimes share land with former military sites.

Roads, growth and the school site decision

School districts look for land with good road access and room for buses and parent traffic. Loop 250 is a 12.245 mile bypass of northern Midland whose west end meets I-20, SH 158 and SH 349, and it is a freeway from that west end to Business SH 349 (Big Spring Street). Sites near the loop have easy access for buses and staff, but they also have higher land costs and more traffic during pickup times, so the concrete plan for entrances and queue lanes becomes important.

Downtown investment matters to education as well. Public investments of $42 million for the Bush Convention Center and $22 million for Centennial Park along Texas Avenue show a city that continues to invest in public spaces, and districts and colleges often coordinate with city projects on streets, trails and utility corridors.

Working safely near students and staff

Schools under construction are sometimes open. Additions and renovations place workers beside classrooms, and that requires fences, covered walkways and strict control of deliveries. We schedule trucks outside drop-off and pickup hours, assign flaggers to bus lanes and keep wash water away from play areas.

Weather adds a layer. Howard County sees common dust storms and high winds in early spring and summer, with an average annual rainfall of about 15.88 inches, and conditions across the basin are similar. We watch forecasts, protect fresh concrete from blowing dust and keep water available for curing, so the finish is not marred by weather. On athletic fields and track surrounds, we also protect adjacent grass and irrigation lines from truck traffic and washout, since a district will be judged by the condition of its fields on opening night.

Pouring on the school year's calendar

Most school work divides into summer and school-year windows. We try to complete foundations and slabs before the weather changes and before the school year begins, and we reserve exterior flatwork for the weeks when heavy equipment has left. Public owners appreciate a plan that shows the critical dates and what must happen to meet them.

When the project involves several buildings, we propose a rolling sequence so one building can be handed over while another is still being poured. This approach can reduce the number of mobilizations and give the district a smoother path to move-in. We list the closeout documents for each building separately, so the district can accept one wing and keep the warranty clock clear for the next. Our government and municipal experience prepares us for public owner procedures, and our schools and healthcare owner relationships keep communication clear.

Plan your campus pours with us

Send the bid documents and the opening date. Concrete Contractors of Midland will return a summer-window calendar and the trades we coordinate.

Common Questions

How do you plan school pours around the academic calendar?

Our calendar counts back from the opening bell and from the date the district needs rooms for furniture and staff. Summer is the busiest period, so we reserve crews and batch plant capacity early. Anything that can be done before summer, such as footings, is placed when possible.

Do you handle public bidding requirements?

Yes. We provide bid forms, bonds and unit prices in the format the district requires, and we respond to addenda promptly.

How thick are bus lanes and drop-off areas?

The civil engineer sets pavement design. Bus lanes use heavier sections than parent lanes, and we price both separately.

Can a school stay open while you work?

It can, with planning. Fencing, flaggers, delivery timing and dust control are part of our plan, and we meet with school administrators to adjust as needed.

What happens if a summer storm delays a pour?

We build float into the calendar and keep alternate dates in mind. When a storm delays work, we update the schedule the same day and tell the owner's rep what the next available window looks like.